ICW Power was invited by CEL to provide a power solution when Ahlstrom wanted to extend their specialty paper and fibers manufacturing plant in Chirnside, Berwick.
The company provided a new switchboard together with three (3x) transformers interlinked by overhead busbars, a large LV switchboard and assciated power factor correction equipment for the system.
Scope of project for ICW comprised :-
-
1x 11KV 1250A air insulated Simoprime switchboard
-
3x 1.6MVA 11KV/400V cast resin transformers each housed within a purpose manuyfactured sheet steel enclosure
-
3x Set of 3200A cast resin overhead interlinking busbars
-
1x 11 metre long, fully type tested 3200A LV switchboard
-
3x 200 Kvar fully automatic power factor corrections cubicles
ICW power carried out the complete site installation and co-ordination of all equipment including testing and commissioning to the clients requirements.